AI affects the environment mainly through the electricity and cooling water used by the data centres that run it, and through the emissions from generating that electricity. The International Energy Agency (IEA) estimates data centres used about 415 TWh in 2024, roughly 1.5% of global electricity, and projects about 945 TWh by 2030.
This article separates what the major agencies have measured or modelled from what is still uncertain. Figures are as of November 2026 and come from the sources listed at the bottom.
How much electricity does AI use?
Nobody publishes a clean "AI only" number for the whole world. The best-sourced figures are for data centres as a whole, with AI as a growing slice of them.
| Measure | Figure | Source |
|---|---|---|
| Global data centre electricity, 2024 | about 415 TWh (about 1.5% of global electricity) | IEA |
| Global data centre electricity, 2030 (base case) | about 945 TWh (just under 3%) | IEA |
| US data centre electricity, 2023 | 176 TWh (4.4% of US electricity) | US DOE |
| US data centre electricity, 2028 projection | 325 to 580 TWh (6.7% to 12%) | US DOE |
| AI share of data centre energy | 10% to 20% (EPRI estimate, 2024) | CRS |
The IEA and DOE numbers use different years and methods, so do not subtract one from the other. The arithmetic you can check yourself: the IEA's two global figures imply growth of about 530 TWh between 2024 and 2030, which is more than a doubling.
AI's share of that growth is larger than its current share of the total. The IEA says accelerated servers, which are mainly driven by AI adoption, are projected to grow about 30% per year and to account for almost half of the net increase in global data centre electricity use. The Congressional Research Service (CRS) notes the EPRI estimate that AI consumed 10% to 20% of data centre energy, and gives no single firm figure beyond that. Treat any AI-only number from elsewhere as an estimate with a wide error bar.
Where does the extra demand land?
The growth is concentrated. The IEA reports that the United States and China together account for nearly 80% of global data centre growth to 2030, and that the US increase is about 240 TWh, up 130% from 2024 levels. Local grids feel this more than global averages suggest: a region with many new data centres can see demand rise sharply even while the global share stays under 3%.
Does AI training or everyday use matter more?
The sources above do not split data centre electricity between training models and answering queries, so this article does not give a ratio. What is documented is that both happen in the same facilities and both draw on accelerated servers. If you want the mechanics of the training side, see how AI learns.
How much water does AI use?
Data centres use water mostly to cool equipment. Evaporative cooling towers consume water as it turns to vapour, and that water must constantly be replenished, according to the CRS. Water also leaves as "blowdown", the flushing that removes mineral scale from the towers.
The CRS report relays an IEA estimate for a 100 MW US data centre: roughly 2 million litres (about 530,000 US gallons) per day on average across cooling strategies. About 725,000 litres per day of that is consumed on site, a little less than 40% of the total. The rest is water consumed elsewhere, mainly at power plants that generate the electricity. The CRS footnote says the IEA assumed a 55% load factor and a water intensity of 0.55 litres per kWh, taken from a 2022 Microsoft blog. You can check the on-site figure: 100 MW at a 55% load is 55 MW, which over 24 hours is 1,320 MWh, or 1,320,000 kWh. At 0.55 L/kWh that is about 726,000 litres, which matches the on-site number.
That is a model for one hypothetical facility, not a measurement of AI. Real water use depends heavily on climate and cooling design. A data centre cooled by air in a cold climate can consume far less than one using evaporative towers in a hot, dry region.
The CRS also records one local example. A city in Oregon reported that nearly 30% of its water consumption was attributable to Google data centres, and the CRS cites 2025 city data of 355 million of 1.232 billion gallons (29%). Water stress is a local problem, which is why a single national percentage tells you little.
What about emissions?
Emissions depend on how the electricity is generated, not just how much is used. The IEA's executive summary gives data centre emissions of about 180 million tonnes of CO2 today, rising to about 300 Mt in its base case by 2035 and up to 500 Mt in its Lift-Off Case. It states these remain below 1.5% of total energy sector emissions in the period.
The IEA also describes how demand is met. In its projections, half of the global growth in data centre demand is met by renewables, with generation growing by over 450 TWh. Natural gas expands by 175 TWh, notably in the United States, and nuclear contributes about the same amount of additional generation. So the emissions outcome turns on that mix: more gas raises emissions, while more renewables and nuclear lower the carbon per kWh.
What is uncertain?
- Future demand. The DOE range for 2028 is wide (325 to 580 TWh), and the IEA models several scenarios beyond its base case. The spread comes from uncertainty about chip efficiency, how fast AI is adopted and how many planned data centres get built.
- Efficiency gains. Hardware and software get more efficient over time, but the sources here do not quantify whether that outpaces growth in use. The projections above already include some of it.
- Disclosure. Companies do not report water and electricity per model or per query in a standard way, which is why estimates differ.
- Everything outside operation. The figures above cover running data centres. Manufacturing chips and building facilities are not covered by these sources, so this article makes no claim about them.
What can you do about your own usage?
The effect is small per person, but the levers are real. A smaller model is often enough for summaries, formatting and simple questions, as covered in small vs large language models. Shorter prompts and fewer retries mean less computation, and how to reduce AI token usage lists concrete ways to do that. None of this changes the grid mix or cooling design, which are decisions for operators and utilities.
Frequently asked questions
- Does one AI query use a lot of electricity or water?
- The sources used in this article do not give a verified per-query figure, so none is stated here. Published per-query numbers vary widely with the model, the hardware, the data centre's cooling design and how the figure is measured. The measurable totals are at the data centre level: about 415 TWh of electricity worldwide in 2024, according to the IEA.
- Is AI the main reason data centre electricity use is growing?
- It is a major reason but not the only one. The IEA says accelerated servers, which are mainly driven by AI adoption, account for almost half of the net increase in global data centre electricity consumption to 2030. The rest comes from conventional servers, storage and cooling.
- Will AI data centres run on renewable energy?
- Partly. The IEA's base case says about half of the growth in data centre demand to 2035 is met by renewables, while natural gas expands by 175 TWh and nuclear adds about the same amount of generation. The mix differs by country.
- Can I reduce the environmental footprint of my own AI use?
- Modestly. Sending fewer and shorter requests, choosing a smaller model when it is good enough, and running small tasks locally all reduce the compute you cause. The effect of one person's habits is small next to the choices of data centre operators and grid operators.
Sources
- IEA — Energy and AI: Energy demand from AI
- IEA — Energy and AI: Executive summary
- US Department of Energy — Report evaluating increase in electricity demand from data centers (December 2024)